You usually determine this.
Installing solid hardwood flooring on concrete.
Humid conditions such as.
When installing a basement hardwood floor the concrete must be flat so the tongue and grooves of the hardwood meet and connect.
Solid parquet hardwood flooring can be glued directly to a concrete slab on grade or above grade with the use of a manufacturer recommended vapor retarder.
You can install either an engineered hardwood floor this is real hardwood done in layers or a laminate floor this is fake floor that looks like hardwood on top of cement.
Laminate will cost less.
Add moisture barrier once the slab is dry cover it with a moisture barrier consisting of two layers of tar.
How to put a wood floor on concrete.
Most recently the most popular method of installing solid 3 4 hardwood floors on concrete was a plywood subfloor attached to the slab.
If the concrete has been painted you will need to remove it to guarantee adhesive will stick.
A variety of concrete fasteners are used including concrete cut.
Engineered hardwood will improve the value of your home.
Old basement slabs can crack and buckle in places.
Most 3 4 inch solid hardwood flooring can be installed using nails or staples over an approved subfloor.
Dry the slab before you prepare the concrete for hardwood flooring it must be dry.
If you have a concrete then you have choices to make 1.
Homes built on concrete slabs are good candidates for solid wood flooring provided that the slab does not wick up too much moisture.
Since humidity causes natural wood to expand and contract your flooring won t be able to move.
You can rent a.
Using a minimum 5 8 cdx plywood the material is installed over the same moisture barriers but it is attached by way of concrete fasteners.
Your concrete floor or slab must be flat.
Stack flooring log cabin style or just spread it around the room but not directly on concrete.
To save money try to reuse your baseboards a fresh coat can give them a new look.
Most engineered flooring can be installed using staples full spread adhesive or a floating method over an approved subfloor.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Treated plywood to the concrete with concrete screws spaced every 16 in.
You need to fill any large cracks and be sure that the entire floor is level.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
This will result in buckling.
Carefully score the top of.
Solid parquet should not be installed below grade.
You don t want to try and glue it down either.
The entire flooring level is considered to be below grade where soil is present along any perimeter wall and is more than 3 above the installed wood flooring level.