Patch the concrete subfloor as required.
Installing carpet on concrete floor of basement.
Follow the steps below to lay carpet on a basement floor.
A basement floor is typically solid concrete with no place to drive carpet nails.
Water at ground level gutters and downspouts connected to splash blocks on soil sloped away from the building.
Take these measurements to your carpet dealer to make sure you get an ample amount of carpet for your job.
Water in porous materials a capillary break for example free draining gravel or a nonporous sheet good like polyethylene.
However installing carpet in the basement area presents a challenge.
This will prepare the floor for successful carpet installation.
If you ve already painted the walls or planned for any other decorating in the room take in.
As a result a carpet without padding will.
Although carpet is held down onto the concrete with installed tack strips along the room s edges the carpet can still move along the surface slightly.
Prevent damp basement floors from ruining carpet and other finished flooring.
While carpet and underlayment will be able to hide some flaws in the concrete sagging or bumby areas may show through.
Install dimpled polyethylene to create an air space between the concrete and the finished floor sealing off dampness and giving moisture a chance to dissipate.
Designing dry warm basement floors.
In some cases you can also install carpet tiles over existing wood tile or vinyl flooring so long as the existing flooring is no more than an inch thick.
Installing carpet over a basement concrete cement floor can be a simple project and requires very few tools to accomplish.
Carpet tiles can adhere to concrete plywood or particleboard subfloors.
To prevent this chip away bumbs using a hammer and chisel.
Carpet is a popular flooring option because it adds a warm inviting feel to a space that typically has concrete floors.
Many carpets and carpet padding are vapor permeable so if your concrete basement is showing moisture it can continue to evaporate up through the pad and carpet.
Use a self leveling compound to fill in any low spots.
Water at the footing perimeter pipe drainage at the footing.
Step 1 measure the room to be carpeted.
Be sure to tell them that you are carpeting over concrete since that requires different carpet material as well as slightly different tools than carpeting over wooden surfaces step 2 bring any drape or paint samples to the carpet dealer for comparison.
Fold back one half of the carpet and spread the mastic on the.
Before you can install carpet tiles you must prepare the existing floor.