The two main installation methods over concrete.
Installing bamboo flooring on concrete.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
Bamboo wood floor can be installed in a number of different ways over different substrates.
If you install bamboo flooring on a concrete subfloor you must check the concrete for moisture content first using a standard moisture meter.
We offer bamboo styles that can be nailed to wood subfloors glued down or floated over concrete.
Floating the floor using tongue and groove flooring not parquet block 2.
Bamboo flooring is very versatile and can be installed on almost any sub floor.
When you install bamboo flooring over concrete you will utilize a glue down method of installation.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
When you are done you will have a very solid durable floor to use for many years.
Bamboo flooring can be either glued down to concrete or screed or floated over an underlay.
Gluing the floor down to a concrete or wood.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
The glue down method can be used for solid or engineered bamboo flooring.
Floating the floor using uniclic flooring.
One of the types of sub floor that it can be installed over is concrete.
Yes depending on the style flooring you choose.
Can i install bamboo on a concrete slab.
This is particularly applicable if the concrete slab was laid within the previous 60 days as this is generally considered to be too freshly laid for a sufficient curing period prior to installation.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
Secret nailing the floor down to a wood subfloor.
The morning star or supreme bamboo tongue and groove floors and morning star click floors can be glued down to concrete on or above grade using adhesive.