In our project we set the tile for the wall opposite the shower door first.
Install shower pan floor or walls first.
And let that dry.
You will later screw the shower pan into the.
Save time by setting several tiles at once.
And then finish by installing that final row of wall tiles so that it overlaps the floor properly.
Ensure that the floor and the shower.
Installing a base on concrete.
An acrylic shower pan is an easier installation than a tile pan.
What you really want to do is tile the walls starting with the second row and work up from there.
Installing a shower pan includes many steps such as cementing the floor to create a sturdy base and installing the shower walls.
They can be installed by a professional crew or by a diyer.
The first row near the floor should be reserved using a ledger or other space saver.
When you re installing a fiberglass or acrylic shower liner enclosure not to be confused with a shower curtain and base over a concrete floor special considerations should be taken to minimize leaks.
The only way that this can happen without detailed planning and careful measurements is by installing the tile on the floor of the shower first.
Ideally you re putting it in an area where a drain has already been roughed in.
Most shower kits include a shower pan and two or three solid wall panels although some are one piece shells in which the shower base or bathtub is integrated with.
Pre fabricated shower stall units are usually fiberglass or acrylic kits created in a factory and shipped to your home in one or several pieces.
Professional tile installation generally utilizes a method where the tile wall hangs over the tile floor.
Pre drill holes through the shower pan rim at the marked locations.
Apply a ring of caulk around the drain and then once the shower pan is in place seal along the perimeter where the pan meets the wall with a bead of caulk.
Before you start setting tile take some measurements and see how the tiles will all lay out image 1.
Test fit the shower pan to confirm the drain opening fits over the drain hole in the floor.
Mark the center of each wall stud on the shower pan rim.
Meanwhile install your floor tiles to the wall.
On the ceiling and floor of the shower we used 2 x 2 tiles and on shower walls 2 x 4 tiles.