Remove the interior trim and measure the width and height of the frame.
Install prehung doors before or after flooring.
Demo out the tub shower unit.
I enjoyed john spier s article on installing pre hung doors what about when the floors will be carpeted.
Before the floors go in you can easily shim one end of the jamb to get the door exactly plumb.
Also measure the jamb depth.
I love my doors which were installed today but since the floors were installed first i now have a gap or two where the new frame doesn t cover the flooring.
Got laminate floors installed in july and then decided i wanted new interior doors.
Wheni install prehung doors the jambs and door are crefully fitted to the final rough opening which includes the finished floor.
Baseboard goes down then the 2nd coat of paint goes on.
The last thing i want is the flooring crew to undercut my jambs remove the doors from their hinges and risk dmaging them or adding an unexpected bump in the flooring which takes me coming back to pull the door.
In my article hanging pre hung interior doors jul 16 i discussed the process i ve developed for installing interior doors in a fast and efficient manner.
The new door should be 1 2 inch less than the height of the rough opening and 3 4 inch less in width.
Install a new vanity.
Worst case a door could be installed with as little as 1 8 inch clearance side to side also check that the jamb depth equals the wall s thickness.
It s a good idea to measure the actual door too.
Before removing the old door have the new one on hand.
After floors this would be a huge pain to do since you would need to pull the door out and saw the jamb.
The clearance between the bottom of the door and the finish floor should be 3 8 inch or less.
Install a new floor.
Install a new fixture.
This is for timing.
The floor coverers will pop the hinge pins and set the doors aside while installing th.
Check that the door will swing in the right direction after it s installed.
That may be installed along with it.
Then the flooring installers come in and do their thing.
Demo out the sink and floor.
Hi apreston0 here is the order you should take in remodeling your bathroom.
Spruce wrote i d vote for doors first it will make installation of the door easier by not having to worry about floor clearances once installed when you re doing the floor you then cut the jamb legs so that they just clear the flooring and any padding glue etc.
Also maybe others are more careful but i found it s hard not to ding the floor a little bit when doing doors afterwards.
On a professional job all the doors are hung first then cased.
Generally speaking door frames are installed and the doors are hung during the trim and finish phase before the flooring is installed but after the painting.
Measure the old door.
By having all the doors and trim up first the painters can come in and spray everything out and get the first coat of color on the walls.